Planning and erection of Phase 1 of the Abu Dhabi Convention Center Hall was accomplished in record time: seele was awarded the contract in April 2006; begin of construction was in September 2006; and already before end of the year 2006 the installation was successfully completed.
The appearance of the façade with its 8.5 m/27 ft high glass fins is very transparent and light. The extra long, single piece glass fins were produced by our subsidiary, sedak. With this project, seele and sedak have set new standards for the execution of glass fins in a fully glazed façade.
|